Products for Petroleum Industries

System -1

System -2

System -3

System -4

System -5

System -6

System -7

System -8

System -9

System -10

Based on our experience, technical data available from National and International sources (papers published by experts in Surface Coating from India and Abroad), the following are our recommended systems for various applications.

Essentially, we are in agreement with the overall scheme of things. But, we do not use Epoxy, but we use Epoxy Urethanes or Urethanes.

TopWe recommend Coal Tar Urethanes for immerse and splash zone applications with an additional coat on splash zone.

All finish coats exposed to UV will be Aliphatic Urethanes only.

We will be using Ceramic coatings based on silicon carbide or glass flakes. We have considered the following parameters in formulating the system.

Very Low Permeability (0.004 gms per hour per mill per sq.mt)

Resistance to Sea Water and Mist

Resistance to Erosion

Resistance to UV

Excellent Adhesion and Flexibility

TopSystem -1

System -1A: Dry Dock

Items/units to be coated under System-1A

Complete Rig legs

Spud tanks

Complete Hull (side shell, bottom plate, structural members etc.) painting below water level including splash zone

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of seawater if any.

Coating 1stCoat: One coat off AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2ndCoat: Two coats of Urethane Coal Tar with glass flakes or silicone carbide 100 microns per coat-SSPL/CER COAT.

One coat of Aliphatic PolyUrethane Coal Tar 40 to 50 microns (on exposed surfaces only) - SSPL/-ALF.

Basic Coating System: High build ceramic PolyUrethanes and Aliphatic PolyUrethanes and anti-fouling coatings.

Design Life: 10 Years

Note: In the splash zone area an additional coat of Urethane Coal Tar will be given.

TopSystem-1B: On-Location Coating

Complete Hull (side shell, bottom plate, structural members etc.) painting below water level including splash zone

Top 120 ft of Rig legs

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water, if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Two coats of Urethane Coal Tar with glass flakes or silicone carbide with a DFT of 600 microns-SSPL/CER Coat.

Coating 3rdCoat: One coat of Urethane Coal Tar with glass flakes or silicone carbide with DFT of 100 microns-SSPL/CER Coat.

One coat of Aliphatic PolyUrethane Coal Tar/Clear, 50 microns DFT-SSPL/ALF.

Coating 4thCoat: Self-polishing antifouling paint 125 to 150 microns (items/units mentioned above except 120 ft from top of rig legs)-SSPL/AF.

Design Life: 5 years

Note: In the splash zone area an additional coat of urethane coal tar will be given.

TopSystem-2

Items/units to be coated-

Side shell plating above splash zone

Structures, Hull wall above splash zone

System-2A: Dry Dock

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Two Components PU MIO PRIMER (SSPL/PUR MIO), 100 microns DFT.

Coating 3rd Coat: Three coats of High build PU MIO PRIMER-300 microns DFT-SSPL/PUR MIO.

Coating 4th Coat: Aliphatic PolyUrethane Clear/Pigmented, 50 microns thickness-SSPL/ALF.

Basic Coating System: Surface Tolerant PolyUrethane with or without glass flake and Aliphatic PolyUrethane.

Design Life: 10 years

TopSystem-2B: On-Location Coating

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Two Components PU MIO PRIMER, 100 microns DFT-SSPL/PUR MIO.

Coating 3rd Coat: Three coats of High build PU MIO PRIMER, 120 microns DFT-SSPL/PUR MIO.

Coating 4th Coat: Aliphatic PolyUrethane Clear/Pigmented, 50 microns DFT-SSPL/ALF.

Basic Coating System: Surface tolerant PolyUrethane with or without glass flake and Aliphatic PolyUrethane.

Design Life: 7 years

TopSystem – 3

Items/Units to be coated-

Substructure

Mud pits & pump rooms

Sheds

Main Deck (see notes)

Draw works shed

Drill floor (see notes)

Jack houses

M/c deck

Shale Shaker funnels

Pump, tanks and other exterior surfaces

Crane pedestals

Mooring fittings

Ventilating fans on deck

Heli-deck (bottom side)

TopSystem - 3A: Dry Dock

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Self priming Polyurethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rd Coat: Three coats of High-build PU MIO PRIMER, 300 microns DFT-SSPL/PUR MIO.

Coating 4th Coat: Aliphatic PolyUrethane Clear/Pigmented, 50 microns DFT-SSPL/ALF.

Basic Coating System: PolyUrethane

Design Life: 10 years

Note:

Wherever required the top coat will be punched with anti-skid material.

On selected areas the coating thickness will be as higher as 2 mm with PolyUrethane Elastomer Grade (SSPL/ELASTO).

Wherever required anti-skid material will be provided.

TopSystem-3B: On-Location Coating

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Self priming Polyurethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rd Coat: Three coats of High-build PU MIO PRIMER, 300 microns DFT-SSPL/PUR MIO.

Coating 4th Coat: Aliphatic PolyUrethane Clear/Pigmented, 50 microns DFT-SSPL/ALF.

Basic Coating System: PolyUrethane

Design Life: 5 years.

Note: Wherever required anti-skid material will be provided.

TopSystem – 4

Items/units to be coated – HELIDECK (Top Surface)

System 4A:  Dry Dock

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Self priming Polyurethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rdCoat: PolyUrethane Ceramic Coating, 300 microns DFT-SSPL/CER COAT.

Coating 4thCoat: Aliphatic PolyUrethane Clear/Pigmented, 50 microns DFT-SSPL/ALF.

Basic Coating System: PolyUrethane

Design Life: 10 years

TopSystem 4B: On-Location Coating

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Self priming Polyurethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rd Coat: PolyUrethane Ceramic Coating, 300 microns DFT-SSPL/CER COAT.

Coating 4th Coat: Aliphatic PolyUrethane Clear/Pigmented, 50 microns DFT-SSPL/ALF.

Basic Coating System: PU Ceramic Coating with anti-skid material

Design Life: 7 years

TopSystem-5

Items/units to be coated: Pot Water Tanks

System-5A: Dry Dock

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1stCoat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Epoxy Polyurethane Primer, 70 microns DFT-SSPL/EPOXY PU.

Coating 3rdCoat: Three coats of PU Coal Tar (Tank Lining grade), 400 microns DFT-SSPL/ACT.

Basic Coating System: Epoxy PolyUrethane

Design Life: 10 years

TopSystem-5B: On-Location Coating

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: PolyUrethane Primer, 70 microns DFT-SSPL/PUR 2 PK.

Coating 3rdCoat: Three coats of PU Coal Tar (Tank Lining grade), 400 microns DFT-SSPL/ACT.

Basic Coating System: PolyUrethane

Design Life: 7 years

TopSystem – 6

Items/Units to be coated-

Preload (ballast) tanks-interior

Mud pits and tanks-interior (dry dock only)

Fuel Oil tank-interior (dry dock only)

Drill water tank-interior (dry dock only)

Sand Traps, cement rooms

Cement handling areas

Sludge tanks-interior

TopSystem-6A: Dry Dock

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL//ACC 18).

Coating 2nd Coat: Self-priming PolyUrethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rd Coat: Two coats of High-build PU MIO PRIMER, 200 microns DFT-SSPL/PUR MIO.

Basic Coating System: PolyUrethane

Design Life: 10 years

System-6B: On-Location Coating

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Self-Priming PolyUrethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rd Coat: Two coats of High-build PU MIO PRIMER, 200 microns DFT-SSPL/PUR MIO.

Basic Coating System: PolyUrethane

Design Life: 7 years

TopSystem - 7

Items/Units to be coated-

Gratings

Ladders

Pipe Racks

Hatch Covers

Cable Trays

System – 7A:  Dry Dock

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1stCoat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Self-Priming PolyUrethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rd Coat:  Two coats of High-build PU MIO PRIMER, 200 microns DFT-SSPL/PUR MIO.

Basic Coating System: PolyUrethane

Design Life: 7 years

System – 7B: On-Location Coating

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Self-Priming PolyUrethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rd Coat: Two coats of High-build PU MIO PRIMER, 200 microns DFT-SSPL/PUR MIO.

Basic Coating System: PolyUrethane

Design Life: 5 years

TopSystem – 8

Items/units to be coated- Piping and Machinery

System – 8A: Dry Dock

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Surface Tolerant High-build PU MIO PRIMER, 100 microns DFT-SSPL/PUR MIO.

Coating 3rd Coat: Two coats of High-build PU MIO PRIMER, 200 microns DFT-SSPL/PUR MIO.

Coating 4th Coat: Aliphatic PolyUrethane, 50 microns DFT.

Basic Coating System: PolyUrethane

Design: 7 years

TopSystem – 8B: On-Location Coating

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2ndCoat: Surface Tolerant High-build PU MIO PRIMER, 100 microns DFT-SSPL/PUR MIO.

Coating 3rd Coat: Two coats of High-build PU MIO PRIMER, 200 microns DFT-SSPL/PUR MIO.

Coating 4th Coat: Aliphatic PolyUrethane, 50 microns DFT.

Basic Coating System: PolyUrethane

Design Life: 5 years

TopSystem – 9

Items/Units to be coated-

Hand Rails

Galvanized Surfaces

System – 9A: Dry Dock

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Self-Priming PolyUrethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rd Coat: Aliphatic PolyUrethane, 50 microns DFT-SSPL/ALI PU.

Basic Coating System: PolyUrethane

Design Life: 7 years

TopSystem – 9B: On-Location Coating

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1stCoat: One coat of AC Clear (Moisture cured clear, which is the tie coat between substrate and subsequent coat-SSPL/ACC 18).

Coating 2nd Coat: Self-Priming PolyUrethane Primer, 100 microns DFT-SSPL/SP 100.

Coating 3rd Coat: Aliphatic PolyUrethane (SSPL/AL PU), 50 microns DFT.

Basic Coating System: PolyUrethane

Design Life: 5 years

TopSystem – 10

Items/Units to be coated-

High Temperature piping, machinery & other surfaces with temperatures between 100 to 4000C

System – 10A: Dry Dock

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1st Coat: One Coat of AC-ZINC, 50 microns DFT-SSPL/ACZ.

Coating 2nd Coat: Heat Resistance Coating, Modified Silicon PU with Aluminium, 25 microns DFT-SSPL/HRC SIL PU.

Coating 3rd Coat: Heat Resistance Coating, Modified Silicon PU with Aluminium, 25 microns DFT-SSPL/HRC SIL PU.

Basic Coating System: Modified Silicones.

Design Life: 7 years

TopSystem – 10B: On-Location Coating

Surface Preparation: Manual/Mechanical cleaning to remove loose rust, dust and other muck. Washing with plain water to remove salts of sea water if any.

Coating 1stCoat: One Coat of AC-ZINC, 50 microns DFT-SSPL/ACZ.

Coating 2ndCoat: Heat Resistance Coating, Modified Silicon PU with Aluminium, 25 microns DFT-SSPL/HRC SIL PU.

Coating 3rdCoat: Heat Resistance Coating, Modified Silicon PU with Aluminium, 25 microns DFT-SSPL/HRC SIL PU.

Basic Coating System: Modified Silicones

Design Life: 5 years